When the telescopes were extended without counterweight,
the crane tipped over. |
| |
|
|
 |
|
The damaged parts of the telescoping stages are
cut out. |
| |
|
|
 |
|
On our 600 t press, we manufacture new shells
which will be fitted in place of the damaged area. |
| |
|
|
 |
|
The welding work is constantly monitored by our
two specialized welding engineers. The weld seams are checked by X-ray.
A detailed protocol is drawn up for all welding work on supporting members. |
| |
|
|
 |
|
Bent cylinder pipes and rods are aligned. Destroyed
cylinders can be newly manufactured by using the expensive head and foot
parts. |
| |
|
|
 |
|
Local damages of the chromium deposit are repaired
by welding-on, polishing, and electroplating. A renewal of the entire
chromium deposit is not required. |
| |
|
|
 |
|
On the testing site, all electrical, hydraulic,
and pneumatic functions are checked and adjusted. Extensive tests are
carried through in order to adjust the safe load indication (SLI). After
welding on the supporting members, the approval by an expert is carried
through. For this purpose, the crane is driven at 1.25 x nominal load. |